How can I avoid that the plugs come out?

Due to temperature changes, the plugs can start to rise and if not fixed on time, they can even come off. Therefore, it is very important to revise the plugs regularly and fix them if necessary with a nylon hammer (delivered as part of the installation kit). This has to […]

Cleaning practices for the ice rink

The following indications about frequency of cleaning are based on average values for outdoor rinks. In case of heavy use or special conditions (dust, wind) you might need to clean more frequently. Indoor Outdoor Low Use Daily – Vacuum cleaning Weekly – Floor polishing Yearly – Power washing Daily – […]

How to use the cleaning machine

Tutorials for the Cleaning Machines: Prepare the cleaning machine Operation of the machine General information about cleaning  Tutorials for the Cleaning Machines (previous to 2020): Smart Cleaner Quick Guide Smart Cleaner How to hook and unhook the Brush Smart Cleaner How to replace the Squeegee Blade Smart Cleaner Troubleshooting Pro […]

How to sharpen figure skates

To sharpen figure skates you need a smaller wheel, 60mm instead of 100mm as you have now. Then you need a toe pick protector to mount on the toe picks. You can both order through Glice.

How often do I have to sharpen?

The frequency of the sharpening with the machine depends on the cleanness of the rink as well as on the weight and skating style of the skaters.  If the skates are not sharpened frequently enough, issues can occur due to deformation of the blades: –We therefore recommend to check the […]

What surface is required below the Glice® panels?

A solid flat and even ground is required. Additionally, you can also consider to put a plastic film or a GeoTex (f.e. PP non woven 120 gr/m2) between the floor and the panels. In this case, make sure the plastic film or GeoTex does not fold when you connect the […]

The panels have different dimensions (length / width)

Make sure the panels have the same temperature in order to avoid differences in the extension / contraction of the panels. Place the panels on the floor (without connecting them) of the installation site several hours before the installation or at least open the packaging of the panels several hours […]